Constraints

Recently Published Constraints Data

Download the latest reports on binding constraints in the Day-Ahead Energy Market and during the operating day.
 

A constraint is the maximum level a transmission system facility (or facilities) can operate to respect the most restrictive of its thermal, stability, and voltage limits. A constraint becomes "binding" when it limits the power flow between locations, which can lead to dispatch of units out of economic-merit order, potentially affecting the spot price.
 

 
Day-Ahead Binding Constraints
More >
Description Timestamp Download
August 05, 2026 08/04/2026 12:27 PM EDT CSV
August 01, 2026 07/31/2026 01:25 PM EDT CSV
August 02, 2026 08/01/2026 12:36 PM EDT CSV
August 03, 2026 08/02/2026 12:24 PM EDT CSV
August 04, 2026 08/03/2026 12:33 PM EDT CSV
 
Preliminary Real-Time Binding Constraints
More >
Description Timestamp Download
Current 08/04/2026 05:55 PM EDT CSV
July 31, 2026 07/31/2026 11:15 PM EDT CSV
August 01, 2026 08/01/2026 11:30 PM EDT CSV
August 02, 2026 08/02/2026 10:35 PM EDT CSV
August 03, 2026 08/03/2026 11:20 PM EDT CSV
 
Preliminary Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/04/2026 05:51 PM EDT CSV
July 31, 2026 07/31/2026 11:18 PM EDT CSV
August 01, 2026 08/01/2026 11:21 PM EDT CSV
August 02, 2026 08/02/2026 11:21 PM EDT CSV
August 03, 2026 08/03/2026 11:21 PM EDT CSV
 
Final Real-Time 15-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/04/2026 01:23 PM EDT CSV
July 30, 2026 07/31/2026 01:45 PM EDT CSV
July 31, 2026 08/03/2026 03:22 PM EDT CSV
August 01, 2026 08/03/2026 03:30 PM EDT CSV
August 02, 2026 08/03/2026 03:54 PM EDT CSV
 
Final Real-Time Five-Minute Binding Constraints
More >
Description Timestamp Download
Current 08/04/2026 01:23 PM EDT CSV
July 30, 2026 07/31/2026 01:45 PM EDT CSV
July 31, 2026 08/03/2026 03:22 PM EDT CSV
August 01, 2026 08/03/2026 03:30 PM EDT CSV
August 02, 2026 08/03/2026 03:54 PM EDT CSV