"C","91¾«Æ·. Operational Capacity Update Report" "C","Filename: morning_report_20261103_20261103115056000.csv" "C","Report for 11/03/2026" "C","Report generated 11/03/2026 20:12:01 EST" "H","Report Type" "D","Operational Capacity Update Report" "H","Section 1. Report Date","Report Time" "D","11/03/2026","11:50:56" "H","Section 2. Prior Day Peak","Hour Ending","MW" "D","11/02/2026","18","14475" "H","Section 3. Operable Capacity Analysis" "H","Description","MW" "D","A. Capacity Supply Obligation (CSO)",27122 "D","B. Capacity Additions EcoMax > CSO",1247 "D","C. Generation Outages and Reductions (Planned + Forced)",6350 "D","Generation Planned Outages and Reductions",4321 "D","Generation Forced Outages and Reductions",2029 "D","D. Uncommitted Available Generation (Non-fast start)",5750 "D","Uncommitted Available Generation Non-fast Before Peak (Info Only)",667 "D","E. DRR Capacity",172 "D","F. Uncommitted Available DRR",14 "D","G. Capacity Deliveries: Net Purchases = (-) Net Sales = (+)" "D","Highgate",0 "D","NB",-155 "D","NECEC",-1090 "D","NYISO AC",-960 "D","NYISO CSC",299 "D","NYISO NNC",49 "D","Phase 2",0 "D","Net Deliveries",-1857 "D","H. Total Available Capacity (A+B-C-D+E-F-G)",18284 "D","I. Peak Load Forecast For Hour Ending18",14500 "D","J. Total Operating Reserve Requirement",1919 "D","K. Capacity Required = I + J",16419 "D","L. Surplus = (+) Deficiency = (-) (H - K)",1865 "D","M. Replacement Reserve Requirement",180 "D","N. Excess Commitment Surplus = (+) Deficiency = (-) (L - M)",1685 "D","Section 4. Largest First Contingency MW",1249 "D","Section 5. Annual Maintenance Schedule (A.M.S) Peak Load Exposure MW",17517 "H","Section 6. Reserve Summary" "D","Ten Minute Reserve Requirement:",1374 "D","Ten Minute Reserve Estimate:",1374 "D","Thirty Minute Reserve Requirement:",545 "D","Thirty Minute Reserve Estimate:",2410 "D","Expected Actions of OP 4:",0 "D","Additional Capacity Available from OP 4 Actions:",0 "H","Section 7. Interchange Summary" "H","Description","Import Limit MW","Export Limit MW","Scheduled Contract MW" "D","Highgate",-222,0,0 "D","NB",-1000,200,-155 "D","NECEC",-1250,0,-1090 "D","NYISO AC",-1600,1200,-960 "D","NYISO CSC",-346,330,299 "D","NYISO NNC",-200,200,49 "D","Phase 2",0,0,0 "H","Section 8. Weather Forecast Summary for the Peak Hour" "H","City","Conditions","Wind","High Temperature (F)" "D","Boston","Mostly Cloudy","SW-8",64 "D","Hartford","Partly Cloudy","S-6",62 "H","Section 9. Units Committed to Meet Minimum Operating Reserve and Replacement Reserve Requirements" "H","Number of Units","MW" "D",0,0 "H","Section 10. Report Comments" "D","" "T","46 lines"